Home → Private clients → Schéma III (SH3)
Schéma III · SH3 · neutral earthing

Your installation is wired in Schéma III.
Here is what that changes.

In a Schéma III installation, appliances are earthed through the neutral conductor instead of a separate protective earth conductor. This was standard practice until the 1980s. Since 1985 it is no longer considered state of the art — and for the past few years, it has changed how often your OIBT inspection (the Swiss Low-Voltage Installations Ordinance) is due.

Book an inspection Ask a question
ONE CIRCUIT IS ENOUGH

The whole installation drops to 5 years

There are no half measures. As soon as any part of the installation is wired in Schéma III, the inspection cycle of the entire installation falls to five years, even if everything else is TN-S.

AGE TELLS YOU NOTHING

An old building is not necessarily affected

Many apartments renovated after 1985 are already TN-S, supply included. Conversely, a building with a cosmetic refurbishment may have kept its old wiring. Only the inspection settles it.

IT IS A BUDGET QUESTION

Know before the work, not after

Renovating an apartment while leaving the supply in Schéma III means closing the walls over the problem. The cheapest moment to rewire is when they are already open.

What the rule says

The facts, with their source. Nothing more.

The inspection cycle

Since 1 January 2018, parts of an installation wired in Schéma III are inspected every 5 years. Since 1 July 2021, this 5-year cycle applies to the entire installation as soon as it contains any Schéma III part. That is section 4.2 of ESTI directive no. 225 (ESTI = Swiss Federal Inspectorate for Heavy Current Installations).

Can be validated once more

If there is no defect, we issue the safety report, with a five-year period. It is the last one: at the next inspection, the installation will have to be TN-S. Those five years are the time you have to organise the work.

The rewiring

ESTI notes that these installations no longer correspond to the state of the art and present a significantly higher risk. It follows that they will have to be remediated and converted to the TN-S system. The five-year period cannot be renewed indefinitely: it leaves time to organise the work, not to postpone it.

Who is responsible for what

The owner is responsible for the safety of their installation and must have defects rectified without delay (art. 5 para. 3 OIBT). If they knowingly leave an installation in Schéma III, they bear the civil and criminal consequences in the event of an accident.

Our own obligation

Holders of an inspection authorisation are required to draw owners' attention to this responsibility and to recommend remediation measures. That is why we tell you in writing, dated, with the report — and not only verbally on the doorstep.

Sources: ESTI directive no. 225, version 0824, in force since 1 August 2024 · Ordinance on Low-Voltage Electrical Installations (OIBT, SR 734.27) · Ordinance on Heavy Current Installations (SR 734.2).

What is not affected

Two exceptions the directive names, and that people often forget to tell you.

The service line

The connection between the consumer's main overcurrent protection and the panel does not fall within the scope of the directive. It is therefore not what moves your installation to 5 years.

Large-section TN

Installations wired in the TN system whose conductors have a cross-section of at least 10 mm² in copper (16 mm² in aluminium) are not covered either.

Why it is treated as a risk

A properly built Schéma III installation does protect. The problem is what happens next.

One mistake is enough

A broken neutral, a phase and neutral swapped in a junction box, a forgotten bridge in a socket: in all three cases, the metal casing of connected appliances can become live. And all three situations do happen, because these installations have been modified for fifty years, often by non-professionals.

No real protection possible

You cannot simply add a residual current device in the panel to make up for it. Sockets with a built-in RCD protect the socket, not the wiring, not the light points, not permanently connected appliances. And fitting an RCD (FI) on SH3 wiring is prohibited, as it cuts the protection when it trips.

The real condition stays invisible

The insulation measurement, which is what allows the condition of an installation to be judged, can only be carried out with disproportionate effort in a Schéma III installation. So we measure poorly what we cannot see.

The rest of the building has changed

Solar PV, battery, EV charging station, smart meter: this equipment copes badly with a Schéma III installation, and many of these old circuits still have cotton sheathing, which ages badly, and are sized for 6 A at most… One kettle and your fuse blows!

The calculation worth doing

Five years is not an eternity. During that period, every alteration — a kitchen, a bathroom, a partial renovation — requires an installation notification and an acceptance inspection. That many visits, that many costs, on an installation that will have to be redone anyway.

The reverse reasoning is often the right one: if work is planned, use the opportunity to redo the panel and the wiring. The extra cost at the time is almost always lower than the sum of the visits you avoid.

We have nothing to sell in this. We do not carry out the work, and we earn nothing on someone else's. That is precisely what makes the advice usable.

Find out where you stand

You manage a building or a condominium

A safety report is issued per part of the installation: in a condominium (PPE), one report for the common areas and one per apartment. A unit wired in Schéma III moves that unit to 5 years — not necessarily the whole building. Knowing which ones are affected changes how you budget.

See the condominium page · See the property management page

Frequently asked questions

How do I know whether my installation is Schéma III?

The inspection tells you for certain. One reliable clue in the meantime: if the inspection cycle of your installation has already been reduced to 5 years, some parts are still Schéma III. A yellow neutral conductor can be another clue.

Do I have to redo everything right away?

No, not immediately. If there is no defect, your installation can be validated once more, for five years at most. The switch to TN-S will be required at the next inspection. Those five years are therefore the time you have to organise it — ideally by making it coincide with work that is already planned.

Do I still receive a safety report?

Yes, if there is no defect that prevents safety from being guaranteed. The report then carries a five-year period. If safety is not assured, no report is issued until the defects have been rectified.

Would a residual current device solve the problem?

No, not in a Schéma III installation. Residual current protection, RCD / FI, is not really achievable there: sockets with a built-in RCD cover neither the wiring, nor the lighting, nor permanently connected appliances. Moreover, fitting an RCD on SH3 wiring is prohibited, as it cuts the protection when it trips.

What if the work is not done before the next inspection?

The switch to TN-S will be required for the installation to be validated again. That is why it is better to put this work in the budget now rather than discover it on the day of the inspection.

Knowing where you stand costs less than finding out

One inspection, a report the same day when the installation is compliant, and a clear answer on Schéma III. Flat rates announced in advance, with no mileage surcharge.

Book my inspection