Your clients ask you who to call for the OIBT inspection of their installation (OIBT = the Swiss Low-Voltage Installations Ordinance). Once you have worked on it, you can no longer do it yourself. Pass the file to us: we do no installation, no repairs, never any commission in either direction, and the corrections listed in the report come back to you.
Defects corrected, you send us the defect rectification notice (ASD): processed within 72 working hours, and your end-of-job invoice goes out without delay.
Floor, room, panel, number of the rule concerned.
No commission, in either direction. What does change hands is files: you pass us the inspections the law forbids you to do, we give your name when one of our clients is looking for an electrician.
They stay with you: the law allows you to inspect your own installations in a dwelling yourself. Or you can delegate it to us.
Shop, restaurant, office, school: after your end of work, an acceptance inspection by an independent body is mandatory within six months. That one, you cannot sign off.
Every 5, 10 or 20 years depending on the building's use (SH3 without a separate protective earth conductor: 5 years), and off limits to whoever worked on the installation.
The nine most frequent defects and how to correct them properly.
Get the documentWe do no installation, no repairs, no maintenance: there is nothing to take from you.
None, in either direction. We invoice our inspection to your client, or to you if you prefer.
By email to asd@controleOIBT.com, with the report reference and the photos and / or details, if we asked you for them. This mailbox is checked regularly.